Vijayawada, Andhra Pradesh Mon – Sat · 9:00 AM to 7:00 PM IST

How much material do you need?

Enter your measurements and get the bags of cement, tonnes of sand and aggregate for the job — then send the list straight to us.

How much for a concrete pour?

Enter the size of the slab, beam or footing you are casting.

Please read this before you order

These are estimates, worked out with the standard site formulas. They do not allow for wastage, spillage, uneven surfaces or openings you have not deducted. Most sites add 5–10% on top. Always confirm the final quantity with your engineer or mason before you place the order.

Useful numbers

Rules of thumb worth knowing

20 bags = 1 tonne

A cement bag is 50 kg, so twenty bags make one tonne. Lorry loads are quoted in tonnes.

1 bag ≈ 0.035 m³

One 50 kg bag of cement takes up about 0.035 cubic metres, or roughly 1.25 cubic feet.

M20 ≈ 8 bags per m³

A cubic metre of M20 concrete takes roughly 8 bags of cement, half a tonne of sand and a tonne of aggregate.

Add 5–10% spare

Every site loses some material to wastage and spillage. Order a little over rather than stopping work halfway.

Need a price today?

Tell us the material, the quantity and where it has to go. We usually reply the same day.

Call us WhatsApp